MENU

Sections

  • Home
  • About
    • The Chestertown Spy
    • Contact Us
    • Advertising & Underwriting
      • Advertising Terms & Conditions
    • Editors & Writers
    • Dedication & Acknowledgements
    • Code of Ethics
    • Chestertown Spy Terms of Service
    • Technical FAQ
    • Privacy
  • The Arts and Design
  • Local Life and Culture
  • Public Affairs
    • Ecosystem
    • Education
    • Health
  • Community Opinion
  • Donate to the Chestertown Spy
  • Free Subscription
  • Talbot Spy
  • Cambridge Spy

More

  • Support the Spy
  • About Spy Community Media
  • Advertising with the Spy
  • Subscribe
May 12, 2025

Chestertown Spy

Nonpartisan and Education-based News for Chestertown

  • Home
  • About
    • The Chestertown Spy
    • Contact Us
    • Advertising & Underwriting
      • Advertising Terms & Conditions
    • Editors & Writers
    • Dedication & Acknowledgements
    • Code of Ethics
    • Chestertown Spy Terms of Service
    • Technical FAQ
    • Privacy
  • The Arts and Design
  • Local Life and Culture
  • Public Affairs
    • Ecosystem
    • Education
    • Health
  • Community Opinion
  • Donate to the Chestertown Spy
  • Free Subscription
  • Talbot Spy
  • Cambridge Spy
Archives

MD 213 Closed in Centreville for Bridge Paving Dec. 13 – 16

December 13, 2019 by Spy Desk

Share

The Maryland Department of Transportation State Highway Administration (MDOT SHA) will close MD 213 (Liberty Street/Commerce Street/Church Hill Road) in Centreville to pave bridge approaches for the MD 213 Bridge over Gravel Run starting December 13 at 7 p.m.

This will be a two-phase closure with different closure points and detours for each phase. Phase I will close MD 213 at Gravel Run on the north end of Centreville beginning at 7 p.m. Friday, December 13, continuing until all work is completed Sunday.

When Phase I is completed, MD 213 will reopen at Gravel Run and the Phase 2 closure will go into effect at the Old Mill Stream bridge at the south end of town. This closure will remain in place until all work is completed.

 

Commercial drivers are advised to plan ahead and avoid downtown Centreville unless making a local delivery. Completion times are estimates and dependent on weather conditions.

These bridge replacement/rehabilitation projects fall under a $5.2 million contract awarded to McLean Contracting of Glen Burnie. On average, more than 10,000 vehicles travel MD 213 through Centreville each day. For more information on both bridge replacement/rehabilitation projects, click here.

MDOT SHA works hard to maintain safe traffic mobility in work zones for motorists, as well as our crews. Drivers need to stay alert, focus on driving and, look for reduced speed limits, as well as other driving pattern changes. Drive like you work here and slowdown in construction zones.

For a list of all major MDOT SHA projects, click on Road Ready, MDOT SHA’s electronic construction brochure. For a look at real-time commute conditions, log onto md511.maryland.gov.

Contact: MDOT SHA Office of Communications – (410) 545-0303

###

The Spy Newspapers may periodically employ the assistance of artificial intelligence (AI) to enhance the clarity and accuracy of our content.

Filed Under: Archives

UMMS Board Members Lobbied for Deals for Themselves Christianson Named Scholastic All-American in Swimming

Write a Letter to the Editor on this Article

We encourage readers to offer their point of view on this article by submitting the following form. Editing is sometimes necessary and is done at the discretion of the editorial staff.

Copyright © 2025

Affiliated News

  • The Cambridge Spy
  • The Talbot Spy

Sections

  • Arts
  • Culture
  • Ecosystem
  • Education
  • Health
  • Local Life and Culture
  • Spy Senior Nation

Spy Community Media

  • About
  • Subscribe
  • Contact Us
  • Advertising & Underwriting

Copyright © 2025 · Spy Community Media Child Theme on Genesis Framework · WordPress · Log in