The following pdfs and Powerpoint files about the pilot program designed to test an oil remediation process to remove any residual oil from the Chestertown Hospital (and beyond) grounds were displayed during a meeting held with UM Shore Health System, their representative engineering consultants, Bud Ivey of Ivey International, and officials from Chestertown on July 28 at the Chestertown Hospital Conference Room. The files were provided by Diversified Buildings Solutions (DBS).
Chester River Hospital Center Power Point
An animation portion of the Ivey-sol presentation will not work in this format but may be viewed here. It illustrates how during the pilot program ending August 1 the Ivey-sol solution is being introduced to the oil contaminated area, breaking it free from its bonding with soil, and recapturing it:
https://www.youtube.com/watch?
For more information about the meeting, go here.
Write a Letter to the Editor on this Article
We encourage readers to offer their point of view on this article by submitting the following form. Editing is sometimes necessary and is done at the discretion of the editorial staff.