MENU

Sections

  • Home
  • About
    • The Chestertown Spy
    • Contact Us
    • Advertising & Underwriting
      • Advertising Terms & Conditions
    • Editors & Writers
    • Dedication & Acknowledgements
    • Code of Ethics
    • Chestertown Spy Terms of Service
    • Technical FAQ
    • Privacy
  • The Arts and Design
  • Local Life and Culture
  • Public Affairs
    • Ecosystem
    • Education
    • Health
  • Community Opinion
  • Donate to the Chestertown Spy
  • Free Subscription
  • Talbot Spy
  • Cambridge Spy

More

  • Support the Spy
  • About Spy Community Media
  • Advertising with the Spy
  • Subscribe
May 15, 2025

Chestertown Spy

Nonpartisan and Education-based News for Chestertown

  • Home
  • About
    • The Chestertown Spy
    • Contact Us
    • Advertising & Underwriting
      • Advertising Terms & Conditions
    • Editors & Writers
    • Dedication & Acknowledgements
    • Code of Ethics
    • Chestertown Spy Terms of Service
    • Technical FAQ
    • Privacy
  • The Arts and Design
  • Local Life and Culture
  • Public Affairs
    • Ecosystem
    • Education
    • Health
  • Community Opinion
  • Donate to the Chestertown Spy
  • Free Subscription
  • Talbot Spy
  • Cambridge Spy
9 Brevities Archives Local Life News

By the Way: Chestertown Paving to Start August 27

August 22, 2017 by State Highway Administration

Share

The Maryland Department of Transportation State Highway Administration will pave 2.5 miles of MD 213 (Maple Avenue/Washington Avenue) through Chestertown in Kent County beginning Sunday night, August 27.

Work will extend from the bridge over Chester River to MD 297 (Worton Road) and include milling/grinding, patching, paving and new pavement markings. MD 291 (Morgnec Road) will also be resurfaced from MD 213 to the Washington College entrance.

Crews are permitted to work overnight 6 p.m. to 6 a.m., Sunday night through Friday morning. These hours may be adjusted in response to traffic conditions. Drivers should also allow a few extra minutes for travel through Chestertown during late evening and overnight hours as single lane closures and flagging occur.

Chestertown is the county seat of Kent County and home of Washington College. Nearly 15,000 vehicles travel MD 213 through the downtown area each day. Travelers are reminded to walk, cycle and drive with extra caution while work is underway. All work should be completed by the end of September.  David A. Bramble of Chestertown is the contractor for this project, valued at $900,000.

The e-Road Ready 2017 electronic construction brochure is available by clicking here. The e-brochure highlights major road construction and maintenance projects in each of the State Highway Administration’s seven engineering districts.

Drivers  should stay alert and look for reduced speed limits, narrow driving lanes and highway workers. Slow down and don’t follow too closely. Work Zone Safety is in Your Hands. Maryland drivers can also know before they go by calling 511 or visiting www.md511.org for live traffic updates, including construction delays and lane closures.

 

The Spy Newspapers may periodically employ the assistance of artificial intelligence (AI) to enhance the clarity and accuracy of our content.

Filed Under: 9 Brevities, Archives, Local Life, News

Some Bridge Relief: SHA Changes Work Schedule

April 13, 2016 by State Highway Administration

Share

The Maryland Department of Transportation’s State Highway Administration (SHA) has updated its work schedule for the steel repairs on the MD 213 (Maple Avenue) drawbridge over Chester River this spring. SHA revised its original schedule that included multi-day (up to five), 24-hour flagging operations for steel beam work for five weeks.

District Engineer Greg Holsey

District Engineer Greg Holsey

SHA’s contractor will only close a lane and alternate traffic with flagging operations during nighttime hours, Sundays through Thursdays to minimize impacts to businesses and local traffic. To safely replace five steel beams, Covington Machine and Welding crews will also need to open the drawbridge for brief periods (15 minutes) during late night hours.

SHA planned a more extensive 24-hour flagging operation that minimized the duration of the repair work. SHA revised the plan this week based on community input, extending the length of time for completion of the steel repair and avoiding daytime lane closures. The steel work is in advance of major cleaning and painting scheduled to begin mid-July.

The contractor will work below the bridge deck during the day and on weekends to ensure all steel repairs are complete before mid-July. Any work during peak travel times, including weekends, will not involve lane closures.

“This is essential work that must be done to keep the bridge operational and safe,” said District Engineer Greg Holsey, adding “We’ve listened to residents, business owners, emergency services and elected officials who asked us to find the best way to do the work with the least impact to traffic. We appreciate the support and guidance provided by the project task force and tourism officials.”

Covington has been working on the bridge since January, with most activity occurring from barges and not impacting traffic. Originally constructed in 1930, the MD 213 drawbridge over Chester River carries an average of 14,000 vehicles each day.

The Spy Newspapers may periodically employ the assistance of artificial intelligence (AI) to enhance the clarity and accuracy of our content.

Filed Under: News

Galena Roadway Improvements to Begin August 11

July 31, 2014 by State Highway Administration

Share

The State Highway Administration (SHA) is starting a resurfacing and safety project the week of August 11 within the corporate limits of Galena, Kent County. The project includes resurfacing and safety improvements, drainage upgrades, Americans with Disabilities (ADA) sidewalk improvements and traffic signal reconstruction at the intersection of MD 213, MD 290 (East Cross Street), and MD 313 (South Main Street).

Construction includes installing pedestrian signals, creating a sidewalk extension along MD 213 northbound to just past Dogwood Lane and the south side of West Cross Street from the entrance to Briscoe Manor parking lot through the PNC Bank property, installing a crosswalk on MD 213 at Briscoe Manor, adding parking spaces along MD 213 and providing signal pre-emption for emergency vehicles along westbound MD 290.

Crews will remove the island in the southeast quadrant of East Cross Street and South Main Street and replace inlets and pipes under the road. SHA awarded the $1.8 million contract to David A. Bramble, Inc., of Chestertown.

The project is part of SHA’s system preservation program and includes patching and resurfacing sections of the three roadways in the town limits to improve ride quality and the integrity of the pavement. Sidewalk ramps serving the roadways will be brought into compliance with ADA standards.

SHA thanks motorists, cyclists and pedestrians for their patience during construction and reminds everyone to stay alert so no one gets hurt.

The Spy Newspapers may periodically employ the assistance of artificial intelligence (AI) to enhance the clarity and accuracy of our content.

Filed Under: 5 News Notes

Routine Maintenance Upcoming on Dover Bridge & Chestertown Drawbridge

April 25, 2014 by State Highway Administration

Share

The State Highway Administration (SHA) will perform routine maintenance requiring short-term openings of the MD 331 Dover Bridge over the Choptank River on Monday, April 28, between 9 a.m. and 3 p.m., weather permitting. SHA will also perform routine maintenance on the MD 213 Chestertown Drawbridge over the Chester River on Wednesday, April 30, between 9 a.m. and 3 p.m., weather permitting.

Motorists can expect brief closures of each bridge that will last no longer than those needed for an average vessel to pass through the open swing span.

SHA’s contractor, Covington Machine and Welding, Inc. of Annapolis, will perform the inspection and maintenance. The routine maintenance includes: greasing the bridge locks, testing the opening and closing of the bridge swing span, raising and lowering the traffic gates, checking traffic and navigational lights and checking hydraulic oil levels for bridge motors.

If inclement weather prevents the work as originally planned, it will be rescheduled for the earliest possible weekday date that weather permits. Anyone with questions about the project may contact the SHA District 2 Office at 1-800-637-9740.

As crews strive to keep work zones safe, each driver needs to actively modify his or her driving behavior to help prevent crashes. Stay alert – look for reduced speed limits, narrow driving lanes and highway workers. Slow down and don’t follow too closely. Safer Driving. Safer Work Zones. For everyone!

The Spy Newspapers may periodically employ the assistance of artificial intelligence (AI) to enhance the clarity and accuracy of our content.

Filed Under: 5 News Notes

Heads Up: Construction Starts on Chestertown Roundabout

April 10, 2014 by State Highway Administration

Share

Now that winter has made its exit, the State Highway Administration (SHA) begins construction of the anticipated roundabout at the intersection of MD 20 (High Street) and MD 291 (Morgnec Road) west of Chestertown on Monday, April 14, weather permitting. The single-lane roundabout will replace the current three-legged intersection at MD 20 and MD 291 in Kent County. Construction should be complete late summer 2014.

“Construction of the new roundabout in Chestertown has been long anticipated by Kent County residents and will promote the efficient flow of converging traffic on MD 20 and MD 291,” said Greg Holsey, District 2 Engineer.“SHA has constructed more than 100 roundabouts across Maryland and there have been no intersection-related fatalities at any of the locations. The design calms traffic and improves safety for the thousands of people who travel through each day,” Holsey said.

Last fall, utility crews relocated lines in preparation for construction work. SHA will maintain traffic during construction for all motor vehicles. For most of the project, all drivers will encounter temporary single-lane closures from noon to 5 p.m. on Monday and from 7 a.m. to 5 p.m. Tuesday through Thursday. SHA’s contractor will use variable message boards, temporary signs, flaggers, cones, and barrels to guide motorists through the work zone.

During the summer months, tractor trailers and other large commercial trucks will be required to travel along a signed detour as the center island is constructed. The detour will use all State-maintained routes and last a few weeks, weather permitting.

SHA’s contractor for the $1.2 million project is David A. Bramble, Inc. of Chestertown.

The Spy Newspapers may periodically employ the assistance of artificial intelligence (AI) to enhance the clarity and accuracy of our content.

Filed Under: 5 News Notes

Copyright © 2025

Affiliated News

  • The Cambridge Spy
  • The Talbot Spy

Sections

  • Arts
  • Culture
  • Ecosystem
  • Education
  • Health
  • Local Life and Culture
  • Spy Senior Nation

Spy Community Media

  • About
  • Subscribe
  • Contact Us
  • Advertising & Underwriting

Copyright © 2025 · Spy Community Media Child Theme on Genesis Framework · WordPress · Log in